Lots of activity and progress being made now that the sun has been shining and daytime temperatures are rising (an 87 degree temperature differential in the span of two weeks: -27 degrees to 60 degrees). All the Phase 1 concrete grade beams and poured walls are now in place.

IMG_2119IMG_2123

IMG_2124IMG_2116

Framing of the Phase 1 riverfront units is in full swing with the deck already in place on the main level and the progress is now visible from the street.

The views are spectacular! Waterfront living re-defined…..