by Mike | News, Uptown Cityside Townhomes, Uptown-Riverfront living downtown TC
Power was connected to the snow melting system today and Shoreline Power Services will commission the system tomorrow morning. TCLP took down the high voltage wires along Pine Street north of Uptown. That means the power poles...
by Mike | News, Uptown-Riverfront living downtown TC
Landscaping and paving are not winter construction activities, but the record-breaking warm weather allowed Molon Excavating, Inc. crews to completely install all the underground utilities and the Grand Traverse Construction concrete artisans to work their magic on...
by Mike | News, Uptown-Riverfront living downtown TC
A nice article on Uptown in the May 14, 2015 edition of the Traverse City Record Eagle.
by Mike | News, Uptown-Riverfront living downtown TC
Lots of activity and progress being made now that the sun has been shining and daytime temperatures are rising (an 87 degree temperature differential in the span of two weeks: -27 degrees to 60 degrees). All the Phase 1 concrete grade beams and poured walls are now in...
by Mike | News, Uptown-Riverfront living downtown TC
Till now, we have relied on an early concept sketch to convey the essence of Uptown. But, because each townhome is custom designed, each building evolves as a compilation of the individual units. Now that the first phase units are designed (and now under construction)...